Customized Substation Solution for Industrial Plant Power Supply

Source: Smartelecmfg 2025-06-13 11:28:33

    Here is the professional English translation of the Industrial Plant Power Supply – Substation Solution, adhering to international standards (IEC/IEEE), accurate terminology, and correct grammar:

1. Power Consumption Scenario Overview
Typical Industrial Load Characteristics:
        Equipment Types: High-power motors (e.g., compressors, pump sets), electric arc furnaces, variable frequency drives (VFDs), lighting systems, HVAC systems, automated production lines.
        Operation Mode: 24/7 continuous production, peak load concentrated during daytime shifts.

Load Characteristics:
        Impact Loads: Starting current of large motors reaches 6~8 times rated current (IEC 60034-12).
        Non-linear Loads: Harmonics generated by VFDs/rectifiers (THDi up to 15%~30%, per IEEE 519).
        Sensitive Equipment: PLCs, precision instruments require voltage fluctuation <±5% (IEC 61000-4-34).

Environmental Conditions: Class 3C3 (high temperature, dust, per IEC 60721-3-3).

2. Substation Capacity Calculation Analysis
Core Formulas (IEC 60364 / IEEE 141):
        1. Total Calculated Load (kVA) = Demand Factor × Connected Load
        2. Transformer Rating (kVA) = Total kVA / Diversity Factor
        3. Short-Circuit Current Calculation: I_sc = U / (√3 × Z_s) (IEC 60909)

Calculation Steps:
1).Load Inventory (Example):2).Active Power Calculation (kW):
        Compressors: 4 × 250kW × 0.85 = 850kW
        Pumps: 8 × 75kW × 0.7 = 420kW
        Lighting: 150kW × 0.9 = 135kW
        Total P = 850 + 420 + 135 = 1405kW

3).Reactive Power Compensation (kVAR):
        Target PF = 0.95 (IEEE 18)
        Initial Q = P × tan(cos⁻¹(Initial PF))
        Compensation Q_c = P × [tan(cos⁻¹(0.8)) – tan(cos⁻¹(0.95))]

4).Transformer Sizing (IEC 60076):
        Total Apparent Power S = P / Target PF = 1405kW / 0.95 ≈ 1480kVA
        Recommended Rating: 2×1000kVA (N+1 Redundancy)

5).Short-Circuit Current Analysis:
        Assume 33kV Side SCC = 25kA (IEC 62271)
        Transformer Impedance Z = 6% → LV Side I_sc ≈ 35kA

3. Substation Configuration
Primary SystemPrimary System

Secondary SystemSecondary System

4. Cost Estimation (USD)
Based on North America/Europe Project Benchmarks (2024)Cost Estimation (USD)

Product recommendations More
PV DC Combiner Box
detail
PV AC Combiner Box
detail
440V/690V Low-Voltage Marine Switchboard
detail
15KV-10KV Outgoing Feeder Switchgear
detail
15KV-10KV Bus Tie Switchgear
detail
Solution More
Bird's-eye view of the 35KV substation at the steel mill
Integrated EPC Solution for Steel Plant 33KV-11KV-0.4KV Substation
  This proposal provides a comprehensive EPC (Engineering, Procurement, Construction) solution for a 33KV-11KV-0.4KV substation, specifically designed for steel manufacturing plants. The solution covers electrical system design, equipment selection, protection & control, automation systems, and civil works, ensuring high reliability and continuous power supply for steel production. The system adheres to international standards (IEC, IEEE) and incorporates smart monitoring and energy management for remote operation and fault diagnostics, optimizing power safety and energy efficiency.
2025/06/18
Bird's-eye view of the waste heat power station system
Comprehensive EPC Turnkey Solution for 3-15MW Waste Heat Power Plants
he 3-15MW waste heat power plant EPC solution integrates Steam Rankine/ORC cycles, DCS automation, and grid-compliant electrical systems (6.6-33kV). Covers design, procurement, construction (18-24 months), and commissioning. Key equipment: waste heat boilers, turbines (3-15MW), condensers. Cost: $1,200-$1,800/kW (scale-dependent). Optimized via modular design, global/local procurement, and financing strategies. Complies with IEC/ASME standards.
2025/06/17
PV Prefabricated Cabin
Medium/High Voltage Grid-Connected PV Switchgear Solutions
The grid-connected voltage levels for distributed photovoltaic systems vary by country and region, primarily depending on local grid infrastructure, technical standards, and distributed energy policies. Below are the grid-connected voltage levels and related standards for some major countries and regions:
2025/06/16
Inquiry Consultation
13655811378
13655811378
13655811378
13655811378
home product email
live chat
my