Comprehensive EPC Turnkey Solution for 3-15MW Waste Heat Power Plants
he 3-15MW waste heat power plant EPC solution integrates Steam Rankine/ORC cycles, DCS automation, and grid-compliant electrical systems (6.6-33kV). Covers design, procurement, construction (18-24 months), and commissioning. Key equipment: waste heat boilers, turbines (3-15MW), condensers. Cost: $1,200-$1,800/kW (scale-dependent). Optimized via modular design, global/local procurement, and financing strategies. Complies with IEC/ASME standards.
2025/06/17