Back to smartelemfg Home
Contact us Merchants settle in
Back to smartelemfg Home
Home -Generator protection relay
GWZC-9885 Generator Rotor Earth Fault Protection Relay
Generator Rotor Earth Fault Protection Relay Side View
Generator Rotor Earth Fault Protection Relay Rear View
GWZC-9885 Generator Rotor Earth Fault Protection Relay
Generator Rotor Earth Fault Protection Relay Side View
Generator Rotor Earth Fault Protection Relay Rear View
GWZC-9885 Generator Rotor Earth Fault Protection Relay

Applicable Scope :The ​GWZC-9885 Generator Rotor Earth Fault Relay​ provides two-stage protection (alarm/trip) for rotor winding ground faults, monitors insulation resistance, and features self-diagnostics. Installed in generator protection or excitation panels, it safeguards power plant and industrial generators against rotor damage.

Product functions(ANSI):50N/51N | 50G/51G

Communication functions :Supported Protocols :​​ IEC 60870-5-103 (over Ethernet) | MODBUS RTU (via RS-485) | IEC 61850 (Ed.2 or Ed.1, as applicable)
​Interfaces:​​2× Ethernet Ports​ (IEEE 802.3 compliant, 10/100 Mbps) | 2× RS-485 Ports​ (ANSI/TIA-485-A standard, galvanically isolated)

Other functions : Support time synchronization via communication message, SNTP (Simple Network Time Protocol) time synchronization, and IRIG-B time synchronization. Support the dot matrix printing function with serial port communication. Support the fault recording function

Product Introduction Technical Parameter Size

Product Introduction :
          The ​GWZC-9885 Generator Rotor Earth Fault Protection Relay​ is designed to detect and protect against ground faults in generator rotor windings, offering two-stage protection with alarm and trip functions for both low and high-resistance faults.

          GWZC-9885 Generator Rotor Earth Fault Protection Relay continuously monitors insulation resistance to detect early insulation degradation and includes self-testing for reliability.

          GWZC-9885 Generator Rotor Earth Fault Protection Relay​ Typically installed in generator protection panels, excitation control cabinets, or substation relay panels, this relay is essential for synchronous generators in power plants and industrial applications, ensuring safe operation and preventing rotor damage.

Product functionsANSI):

1.Single-Phase Ground Fault Protection (ANSI 50N/51N)
2.Double-Phase Ground Fault Protection (ANSI 50G/51G)

Electrical Specifications​

​Power Supply:​​

● AC: 85-264V, 47-63Hz (≤15% THD)
● DC: 100-370V (≤5% ripple)

​Rated AC Parameters:​​

● Voltage: 100V/√3 or 100V
● Current: 5A/1A
● Frequency: 50Hz

​Overload Capacity:​​

● Current Circuit: 2×In continuous | 10×In (10s) | 40×In (1s)
● Voltage Circuit: 1.5×Un continuous

​Power Consumption:​​

● Supply: <10W (static), ≤15W (trip)
● Current Circuit: ≤1VA/phase (5A) / ≤0.5VA/phase (1A)
● Voltage Circuit: ≤0.5VA/phase

​Digital Output:​​

● Dry contact (8A@250VAC / 30VDC)
● Dielectric: 4kVAC (coil-contact), 1kVAC (open contact)
● Operating Time: 5ms (typ) / 8ms (max)
● Mechanical Life: 100k operations

​Protection Performance

​Operating Range:​​

● Voltage: 0.5-120V (phase)
● Current: 0.02-20×In
● Zero-Seq Current: 0.05-20A
● Frequency: 35-65Hz | Delay: 0-100s

​Accuracy:​​

● Voltage/Current: ±2.5% or ±0.1V/±0.05A (whichever greater)
● Frequency: ±0.01Hz
● Settings: ±2.5%

​Trip Time:​​

● Instantaneous: ≤35ms (≥1.2× setting)
● Time-Delayed: ≤1% of setting or 35ms

Measurement & Monitoring​

​Range:​​

● Voltage: 0.5-120V | Current: 0.02-1.2×In

​Accuracy:​​

● V/I: ±0.2% | Frequency: ±0.01Hz | Other: 0.5%
● Time Sync: ≤2ms | SOE: ≤1ms

​Event Recording:​​

● 128 protection trips/operations
● 32 self-tests/fault waveforms (COMTRADE)

​Environmental & Mechanical​

​Operating Temp:​​

● Standard: -10°C to +55°C
● Extended: -40°C to +70°C*

​Storage Temp:​​ -40°C to +80°C
​Humidity:​​ 5-90% RH (non-condensing)
​Pressure:​​ 60-110 kPa
​Compliance:​​

● IEC 60255-21 (vibration/shock)
● IEC 61000-6 (EMC)

Related products More
GWZC-9887 Generator-Transformer Differential Protection Relay (87G|87T)
GWZC-9887 Generator-Transformer Differential Protection Relay
detail
GWZC-9886 Generator Backup Protection Relay
GWZC-9886 Generator Backup Protection Relay
detail
GWZC-9884 Generator Differential Protection Relay(87H | 87 | 87A)
GWZC-9884 Generator Differential Protection Relay
detail
GWZW-9883 Generator Comprehensive Protection Relay
GWZW-9883  Generator Comprehensive Protection Relay
detail
GWZC-9000 Sewage Treatment Automation Control System
GWZC-9000 Sewage Treatment Automation Control System
detail
Technical Knowledge More
Automatic Transfer Switch (ATS) Side View
What is Parallel Operation
​Parallel operation​ involves connecting two or more independent AC power sources (e.g., generators, grids) to share electrical loads seamlessly. This process—synchronization—demands precise matching of voltage magnitude, frequency, and phase angles between systems before interconnection. Critical for grid expansion, backup power, and renewable integration, it enables redundant supply during failures.
2025/08/15
Generator-Transformer Differential Protection Relay Rear View
Ring-Closing Operation: Definition & Importance in Power Grids
A ring-closing operation involves closing a normally open switch within a closed-loop electrical network fed by a single power source. This creates parallel paths to redistribute loads without interruption, primarily for maintenance or network reconfiguration. Key prerequisites are voltage difference under 5%, phase angle alignment below 5 degrees, and pre-calculation of induced circulating currents to avoid equipment damage. Distinct from connecting independent systems, this procedure requires advanced monitoring but avoids synchronization complexity. Strict protocols using real-time sensors and simulations ensure safe execution, making it fundamental for resilient distribution networks like ring-main units (RMUs) in urban grids.
2025/08/14
Synchronism Check Function vs. Synchronizing Function: Roles, Differences, and Applications
This article compares the ​synchronism check function​ in line protection devices and the ​synchronizing function​ in dedicated synchronizing equipment. The ​synchronism check function​ serves as a safety interlock for circuit breaker closing operations, while the ​synchronizing function​ enables precise generator synchronization and critical tie-line interconnections with active parameter regulation. Explore core principles, application scenarios, and technical distinctions between these critical power system components.
2025/08/11
GWZC-9885 Generator Rotor Earth Fault Protection Relay
Generator Rotor Earth Fault Protection Relay Side View
Generator Rotor Earth Fault Protection Relay Rear View
Inquiry Consultation
产品表单
Inquiry Consultation
+86-17621210051
+86-17621210051
+86-17621210051
+86-17621210051
home product email
live chat
my